Grading

Busch Drive Buildings 1&2

Strack, Inc. was selected by Alston Construction and Panettoni Development Corporation to construct Buildings 1 and 2 on Busch Drive in Cartersville, GA in 2020 and 2021.  This project totaled more than 643,716 SF of building pad and required more than 406,000 CY of excavation.  Strack was responsible for all retaining walls, site grading, utilities, stormwater infrastructure, and paving.  Strack, Inc. is currently under construction of Building 3 which should be complete in late 2022.

  • Client: Panettoni Development / Alston Construction
  • Location: Cartersville, GA
  • 643,716 SF of building Pad
  • 406,000 CY Excavation
  • Retaining Walls, Utilities, Stormwater Infrastructure