Completion
100%
Morrow High School
This project involved completion of all sitework scopes of work for the construction of a new high school. We completed the following items on this project: 62 acres of clearing...
Completion
100%
Flint River Outfall Replacement Phase 2
This project was a dig and replace project that consisted of laying 11,752 LF of 42", 48" & 60" fiberglass reinforced polymer gravity sewer pipe in an existing sewer easement...
Completion
100%
Hopkins Creek Interceptor Project
This project consisted of the installation of a new gravity sewer line in wet and rocky conditions. Nearly the entire length of the line was drilled and blasted in order...
Completion
100%
Yellow River Sprayfield
The project consisted of a new Sewer Spray field located on Stephens Road in Newton County with 700 LF of 24” DR 17 HDPE pipe, 2550 LF of 20” DR...
Completion
100%
Turkey Run Landfill
This project consisted of the construction of a 12 acre MSW Landfill Cell, 10 acre MSW Solid Waste Landfill Cell, 11 acres of clearing, 132,100 CY of structural fill from...
Completion
100%
GDOT I-285/SR 400 Interchange Improvement Project – Trenchless Crossings
This project consisted of jack and bore 510 L.F. 72’’O.D. Steel Casing for 54’’ RCP Storm Drain (Robbins SBU-M), jack and bore 450 L.F. 30’’ O.D. Steel Casing for new...
Completion
100%
Simpson Yard Intermodal Facility Expansion
This project was for the expansion of the Simpson Yard Intermodal Facility in Jacksonville, Florida. The project included removal and disposal of existing drainage pipe and structures, asphalt and concrete...
Completion
100%
Club Drive Design Build
This project consisted of the development of construction plans, utility plans, erosion and sediment control plans, and temporary and permanent traffic control plans for the realignment of Club Drive –from...
Completion
100%
Appalachian Regional Inland Port
"Constructed an intermodal yard on the approximately 44-acre site. Site grading work included clearing and grubbing, erosion control, backfilling, grading, compacting select material for subgrade, excavation of a storm drainage...
Completion
100%
Mill Creek Apartments
This project consisted of 170,000 CY of mass grading, erosion control, storm drain (4,248 LF), water distribution (3,500 LF), sanitary sewer (4,600 LF), modular block retaining walls, paving (15,000 LF)...