Project Category: Pipeline

Completion
100%
This project involved completion of all sitework scopes of work for the construction of a new high school. We completed the following items on this project: 62 acres of clearing...
Completion
100%
This project was a dig and replace project that consisted of laying 11,752 LF of 42", 48" & 60" fiberglass reinforced polymer gravity sewer pipe in an existing sewer easement...
Completion
100%
This project consisted of the installation of a new gravity sewer line in wet and rocky conditions. Nearly the entire length of the line was drilled and blasted in order...
Completion
100%
The project consisted of a new Sewer Spray field located on Stephens Road in Newton County with 700 LF of 24” DR 17 HDPE pipe, 2550 LF of 20” DR...
Completion
100%
This project consisted of jack and bore 510 L.F. 72’’O.D. Steel Casing for 54’’ RCP Storm Drain (Robbins SBU-M), jack and bore 450 L.F. 30’’ O.D. Steel Casing for new...
Completion
100%
This project consisted of 170,000 CY of mass grading, erosion control, storm drain (4,248 LF), water distribution (3,500 LF), sanitary sewer (4,600 LF), modular block retaining walls, paving (15,000 LF)...
Completion
100%
This project consisted of erosion control, clearing 22 acres, mass grading ( 230,000 CY), storm drain, sanitary sewer, water distribution, retaining walls (6,086 LF), paving, concrete paving, curb and gutter...
Completion
100%
This project consisted of manufacturing facility expansion (600,000 SF building pad – with soil cement stabilization), import fill dirt for building pad (100,000 CY ), underground detention system (5,000 LF),...
Completion
100%
This project consisted of all utilities (2000 LF water distribution, sanitary sewer, storm drain) earthwork (72,000 CY total excavation), clearing of 12 acres, and all erosion work for the site.