Toyo Tire Plant Expansion – Phase IV (Bartow County, Georgia)

Toyo Tire Plant Expansion – Phase IV (Bartow County, Georgia)

Project Description

Project consisted of laying 1250 linear feet of 96” RCP, 2456 linear feet of 72” RCP, 3645 linear feet of 60” RCP and 6250 linear feet of arterial RCP pipelines for the storm system. Installed thirteen 12’ diameter pre-cast concrete bases ranging in weight from 20 to 30 ton structures set by hydraulic excavator. Installed 3,650 linear feet of 36” to 54” ductile iron piping for impervious roof drain piping under the building slab. Installed 10,500 linear feet of 12” ductile iron pipe for fire line water system.

Owner Name & Location

TOYO Tires Manufacturing North America, White GA

Completion Date

December 2014