Project Description

Project consisted of furnishing and installing storm drainage system and underground utilities (water and sewer) at new intermodal facility. The total installed quantities for the storm drain portion project were 18,315 LF of 6” perforated underdrain, 8,040 LF of 18” HDPE, 4,002 LF of 24” HDPE, 4,458 LF of 36” HDPE, 7,363 LF of 48” HDPE and 1,256 LF of 60” HDPE. All storm drain was bedded with gravel 6” over the top of the pipe; many of the storm drain lines crossed perpendicular with new rail lines (installed above the storm drain lines). A total of 164 storm drain manholes were installed with over half of the manholes being 6’ to 8’ in diameter. The 8” sewer installed on the project was 2,276 LF and the total water main installed consisted of 2,725 LF of 12” DIP.

Owner Name & Location

Norfolk Southern Corporation

October 29, 2015